The block work reaches first floor level
House Photos: Blockwork Reaches First Floor
13 November 2005
13 November 2005
The block work reaches first floor level
7 November 2005
The building has finally begun!
27 October 2005
The building’s base is laid
21 October 2005
The building work on the foundations continue
4 October 2005
Second filming with Cheese and Crackers.
3 September 2005
Garage Demolished
29 August 2005
Garage roof tiles removed.
10 August 2005
Day 2 of filming with Cheese and Crackers. This time at the Centre for Alternative Technology.
9 August 2005
Introductory filming with Cheese and Crackers team for Designer Homes